Forster Irrigation was contracted to do a full “Fire Prevention” reticulation project. This involved routing all the boreholes and municipal supply lines into a 1500m3 reservoir. From there we set up both a domestic supply system using pressure regulating pumps and a pipe network back into the plant and a fire sprinkler system using specially made fire pumps with low pressure activation, 8” steel supply lines to the main fire mains and head controls as well as general maintenance of the existing fire sprinkler system in partnership with a local Fire sprinkler company. This system was tested and received full Fire Prevention & Inspection Board approval.

Comments

comments