This project involved the complete design, supply and installation of the project. we selected a point on the river where there was a long stretch of deep sand after conducting probe tests along 7km of the river. We then fitted a 3.5m deep sand borehole and equipped it with a 5.5kW motor and a 15m3/h to 100m head pump. We put a 9kW array of 36 x 255W panels located 200m away at a village. We then laid a 9km 90mm pipeline which was dug by the community in 10 days. At the highest surrounding point we installed a 92m3 tank which then gravitates to 4 different tank points located 2.5km away from each other. The project from start to finish took 3 weeks.